Bid Manager series · Part 2 of 3

Bid Manager, Part 2: Inside a tender

The map, the dates, the GC contact, your scope and the drawings, all on one tender.

Press any card on the Bid Manager board and the tender opens. Everything about that bid is in one place, and when the GC makes the call you mark it awarded or lost.

In this part you'll learn how to:

  • Use the tender header to edit details and mark a bid awarded or lost
  • Find the site on the map and open directions for the job walk
  • Track invited, job walk, RFI, due, start and finish dates
  • Keep the GC contact, scope of work and drawings with the bid

The Drawings tab holds every tender document and addendum as it arrived, sorted into folders like architectural, structural and addendums.

Download the PDF guide below, then carry on to Part 3.

Download the PDF guideAll tutorialsStart free trial