Change Order Management Software for Subcontractors | SubTrade
๐Ÿ“ Get Paid Faster

Change Orders

Stop letting extra work go unpaid. Create, submit, and track every change order from draft to invoice โ€” with a built-in worksheet for materials, labour, equipment, and subtrades, plus automatic markup calculations.

0
Unpaid change orders
Unlimited
Custom stages
Auto
Tax + markup calc
Home / Projects / Bridgeview Tower / Change Orders
+ Create
$14,820
3 draft
Draft
$22,440
2 submitted
Submitted
$8,373
1 approved
Approved
$1,265
1 rejected
Rejected
$23,633
7 invoiced
Invoiced
โœ๏ธDraft3โ‹ฏ
Spray Foam Insulation โ€” Parkade Ceiling
#CO-BT2026001-011
Additional Blocking โ€” Suite 304
#CO-BT2026001-012
Revised Bulkhead Detail โ€” Level 2
#CO-BT2026001-013
โžคSubmitted2โ‹ฏ
Corridor Drywall Upgrade โ€” Level 3
#CO-BT2026001-009
Steel Stud Furring โ€” Mechanical Room
#CO-BT2026001-010
๐Ÿ‘Approved1โ‹ฏ
3/4 Plywood on Soffit
#CO-BT2026001-006
๐Ÿ‘ŽRejected1โ‹ฏ
Change Order #1
#CO-BT2026001-004
๐ŸงพInvoiced7โ‹ฏ
Exterior Sheathing โ€” South Elevation
#CO-BT2026001-002
Plywood Backing โ€” Curtain Wall Openings
#CO-BT2026001-003
Mechanical Room Drywall โ€” Level P1
#CO-BT2026001-001
Drag & drop COs between stages ยท Add unlimited custom stages to fit your workflow
๐Ÿ“‹ General Info

Every Detail Captured โ€” Name, Status, Scope & Attachments

Each change order has a full detail view with three tabs. Start in General Info: set the name, status, recipients, drawings reference, reason for change, and a rich text scope of work. Attach photos, PDFs, or drawings directly to the CO so the GC has everything in one place.

  • โœ“ Name, status, and recipient fields on every CO
  • โœ“ Link drawing numbers directly to the CO
  • โœ“ Rich text scope of work with bullet formatting
  • โœ“ Reason for change dropdown (Owner/GC Request, Differing Conditions, etc.)
  • โœ“ Attach photos, PDFs & drawings in one click
Try It Free โ†’
๐Ÿ“„ General Info
๐Ÿ“‹ Worksheet
๐Ÿ“Š Summary
Name
Exterior Sheathing โ€” South Elevation
Status
Invoiced โ–ผ
Recipients
Ryan Mitchell (Estimator) ร— Kyle Walker (Project Manager) ร—
Scope of Work
Drawings
A2.02 โ–ผ
Reason for Change
Owner/GC Request โ–ผ
B๐ผU๐Ÿ”—โ‰กโ‹ฎโ‰ก
Supply and installation of Exterior Sheathing โ€” South Elevation and Soffit bulkhead as per Drawings.
  • On Main floor Steel Stud only
ร—๐Ÿ–ผ๏ธIMG
ร—๐Ÿ“„PDF
+Attach

๐Ÿงฎ Worksheet

Build Your Cost Breakdown โ€” Materials, Labour, Equipment & Subtrades

The Worksheet tab breaks your change order into four cost categories. Add line items for materials, labour, equipment, and subtrade costs โ€” each with type, description, quantity, and rate. Totals calculate automatically. No spreadsheet needed.

  • โœ“ Four categories: Materials, Labour, Equipment, Subtrades
  • โœ“ Type dropdown + description, quantity & rate per line
  • โœ“ Row and section totals calculate instantly
  • โœ“ Add unlimited rows per category
  • โœ“ Delete rows with one click
Try It Free โ†’
๐Ÿ“„ General Info
๐Ÿ“‹ Worksheet
๐Ÿ“Š Summary
Materials
Type
Sheathing Material
1
$8,000.00
$8,000
ร—
Total: $8,000.00
+ Add Row
Labour
Type โ–ผ
Exterior Sheathing Installation
1
$3,687.00
$3,687
ร—
Total: $3,687.00
+ Add Row
Equipment
Type โ–ผ
Equipment Extra Time
1
$600.00
$600
ร—
Total: $600.00
+ Add Row

๐Ÿ’ฐ Auto Markup & Tax

Apply Markup, Overhead & Profit โ€” Grand Total Calculated Automatically

The Summary tab takes your worksheet totals and lets you apply profit, overhead, and custom markup percentages per category โ€” using compounding or flat markup logic. Tax is calculated automatically. The grand total updates instantly as you type.

  • โœ“ Compounding or flat markup โ€” your choice
  • โœ“ Profit, overhead & custom % per category
  • โœ“ Tax calculated automatically (configurable rate)
  • โœ“ Grand total updates live as you adjust markups
  • โœ“ Subtotal visible before tax
Try It Free โ†’
๐Ÿ“„ General Info
๐Ÿ“‹ Worksheet
๐Ÿ“Š Summary
Markup type: Compounding Flat
Change Order Summary
CategoryTotalProfitOverheadCustomTotal
Labour$3,687.00
15 %
10 %
0 %
$4,688.00
Materials$8,000.00
12 %
8 %
0 %
$9,715.00
Equipment$600.00
10 %
5 %
0 %
$693.00
Subtrades$0.00
0 %
0 %
0 %
$0.00
Change Order Management

Common Questions

Everything you need to know about managing change orders in SubTrade.

๐Ÿ“‹

What are the five change order stages?

Draft, Submitted, Approved, Rejected, and Invoiced. Each CO moves through these stages as you work with your GC โ€” giving you a full audit trail of every scope change.

๐Ÿ’ฐ

How does the markup calculator work?

Set markup percentages for Labour, Materials, and Equipment separately โ€” with different rates for cost and sell. SubTrade calculates overhead, profit, tax, and grand total automatically.

๐Ÿ“Ž

Can I attach drawings to a change order?

Yes. Attach photos, PDFs, and drawings directly to any change order. Your GC gets everything they need to approve the work โ€” no back-and-forth emails required.

๐Ÿ“ค

Can I send the CO directly to the GC?

Yes. Hit Send and the GC receives a professional change order they can review and digitally approve. No printing, no scanning, no chasing signatures.

๐Ÿ“ฑ

Can I create change orders from the field?

Absolutely. SubTrade is fully mobile โ€” create, price, attach photos, and submit a change order from your phone in under 2 minutes, right from the job site.

๐Ÿš€

How much does SubTrade cost?

Start free โ€” no credit card required. Paid plans from $299/month + per user. Yearly membership saves 20%.

Start Free Trial โ†’